Kai Tak Development – stage 4 infrastructure works at the former runway and south apron

The scope of this part of the project (Stage 4 infrastructure at the former runway and south apron) comprises:

construction of the following items of works located at the former runway –

  1. a section of dual two-lane Road D3 (Metro Park Section) (MPS) of about 1 130 metres (m) long connecting Road D2 at the former north apron and Road D3A at the former runway, including about 200 m under a section of dual two-lane Road D3 (Metro Park Section) (MPS) of about 1 130 metres (m) long connecting Road D2 at the former north apron and Road D3A at the former runway, including about 200 m underpass with associated 320 m depressed road, 360 m elevated road and 250 m at grade road;
  2. a single two-lane Road L12d of about 47 m long connecting Road D3A at the former runway;
  3. a salt water pumping station and associated water intake;
  4. a sewage pumping station; and
  5. landscaped decks of about 380 m long in total with a minimum width of about 11 m above Road D3 (MPS) and landscaped area adjoining Road D3 (MPS) providing a total of about 3.9 hectares of public open space.